construction

ARENA ZAGREB

Arena zagreb konstrukcija
Tweet project: ARENA ZAGREB  multi-purpose sports hall client: Ingra d.d. author: UPI-2M status: built 2008. area: 90.340 m2 location: Lanište, Zagreb, Croatia awards: ArchDaily, 2011 - finals in the best sports building category Arhitekton, 2011 - finals for year award of Arhitekton magazine Innovation and design awards, 2010 -finals for year award of magazine Traveller ... ARENA ZAGREB

LOGISTIC AND DISTRIBUTION CENTER

Announcement September 5, 2018. Construction of the Logistic and Distribution Center (LDC) in Vukovinsko Polje , Velika Gorica is ongoing. The construction of the center, whose total area will be around 21,000 m2, started in April 2018, and for this project we provided architecture and structures design.

GLASS FACTORY AGC

AGC, glass factory, AGC Asahi glass, tvornica stakla, brazil, upi-2m, structure, construction, steel, čelik
AGC Tweet project: AGC glass factory client: AGC Asahi Glass / RUF author: AGC Asahi Glass status: built 2013. location: Guaratinguetá , Brazil I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo. SIMILAR PROJECTS TURNINA TREE ... GLASS FACTORY AGC

FRAMEWORKS

croatian pavilion, venice architecture biennale, venecijanski arhitektonski bijenale, 2004, frameworks, croatia, hrvatska, steel, čelik, venice bienalle 2004, construction, upi-2m, upi2m
Tweet project: FRAMEWORKS - Venice biennale 2004. client: Studio UP author: Studio UP & Ivana Franke & Petar Mišković status: built 2004. location: Arsenal, Venice, Italy SIMILAR PROJECTS ZAMET (steel) BUSINESS PARK ZAGREB GLASS FACTORY AGC HBK FESTIVAL OF LIGHTS ZAGREB "TWISTED" NOVI STIPIĆ (steel) KOPRIVNICA (steel) PALACE CEDULIN (steel) APOLO (steel) MAIN SQUARE IN UMAG ... FRAMEWORKS

APOLO

apolo, upi-2m, upi2m, konstrukcija, construction, čelik, steel, structure, 3lhd, cinema apolo, kino apolo
APOLO Tweet project: cinema APOLO client: 3LHD author: 3LHD status: built 2007. area: 1.800 m2 location: Ilica, Zagreb, Croatia SIMILAR PROJECTS EXPO 2005 GLASS FACTORY AGC FRAMEWORKS AGMAR (STEEL) KENDA ZAGREB DANCE CENTER ARENA CENTAR (steel) EURASIA TUNNEL FRENCH PAVILION HBK NOVI STIPIĆ (steel) SEAFRONT IN SPLIT ZAMET (steel) ZARA (steel) PEVEC RIJEKA (steel) MMHB CIPEA HOUSE ... APOLO

SEAFRONT IN SPLIT

riva, splitska riva, seafront in split, 3lhd, upi-2m
Tweet project: SEAFRONT IN SPLIT - SPLITSKA RIVA client: Studio 3LHD d.o.o. author: Studio 3LHD d.o.o. status: built 2005. area: 14.053 m2 location: Obala hrvatskog narodnog preporoda, Split, Croatia recognitions: on following link SIMILAR PROJECTS PALACE CEDULIN (steel) ZAMET (steel) AGMAR (STEEL) EURASIA TUNNEL FESTIVAL OF LIGHTS ZAGREB "TWISTED" ARENA CENTAR (steel) KENDA ZARA (steel) FRENCH PAVILION ... SEAFRONT IN SPLIT

MAIN SQUARE IN UMAG

main square, SREDIŠNJI GRADSKI TRG U UMAGU , UPI-2M, trg, gradski trg, square, umag, hrvatska, croatia, architecture
Tweet project: MAIN SQUARE IN UMAG, canopy, mast and benches client: City of Umag author: Nenad Fabijanić & UPI-2M status: built 2005. area: 350 m2 location: Main Square, Umag, Croatia awards: Architectural competition - 1st prize (work as a colaborators with prof. Nenad Fabijanić) - 2003 SIMILAR PROJECTS Mandalina resort VILLAS BOSANKA, DUBROVNIK GLOGOVAC, MONTENEGRO PRŽNO-PODLIČAK CZECH CAMP MAIN ... MAIN SQUARE IN UMAG

Agmar

CONTEXT – parcel is situated on the outskirts of the town (SE part), morphologically a quite specific heterogeneous environment. A morphology of single volume building is presented by transformation of forms which unite the logic of existing elements of greenhouse/train/hangar and architectural interpretation of the facilities. Western facade represents the view of the building’s section itself on that very position. Northern and southern facades are perforated by a random pattern of openings, giving two-way lighting to the interior. Night brings the inverse effect, as the luminous projections on the cylinder create a dotted morphology for the mono-volume building. Roof cover is kal-zip steel sheet. Bearing structure is made out of equal prefabricated reinforced concrete arched elements that are shortened at their bottom. Internal office area has bearing composite structure (steel + reinforced concrete).

Main square in Umag, 1st prize in the competition (as collaborators of Prof. Nenad Fabijanić), 2003.

Tweet project: MAIN SQUARE IN UMAG, canopy, mast and benches client: City of Umag author: Nenad Fabijanić & UPI-2M status: built 2005. area: 350 m2 location: Main Square, Umag, Croatia awards: Architectural competition – 1st prize (work as a colaborators with prof. Nenad Fabijanić) – 2003 SIMILAR PROJECTS MAIN SQUARE IN UMAG VILLAS BOSANKA, DUBROVNIK BAŠKA ARENA CENTAR URBAN ... Main square in Umag, 1st prize in the competition (as collaborators of Prof. Nenad Fabijanić), 2003.