Announcement: March 8 2016. UPI-2M started with introducing of BIM (Building Information Modeling) design process. By this introduction, through the Allplan 2016 Engineering and SCIA programs, we managed to connect all our processes, from the stage of conceptual thru structural and workshop design, and with this technology we managed to precisely enable all details to be visible in 3D. BIM allows investors to "feel" every detail of the project, and from our perspective it contributes to efficiency, mistake reduction or even confusion and facilitate understanding of the drawings and construction at the site. More about Allplan 2016 Engineering in further text...